Flexible scheme of large-span double-layer cable
The project jointly developed with Southeast University can achieve a long span of about 60m, further improving power generation and land use efficiency, and reducing costs.
Southeast University establishes close cooperation
Laboratory modeling and wind tunnel analysis
Force analysis is more in line with the actual situation