No need to weld on the project site; No need to level the land, saving construction costs;
Fully connected structure and grounded as a whole;
High degree of pre installation and quick installation;
Single column, double column structure, good stability and long service life;
Both concrete foundation and steel pipe pile foundation are suitable.
No need to weld on the project site; No need to level the land, saving construction costs;
Fully connected structure and grounded as a whole;
High degree of pre installation and quick installation;
Single column, double column structure, good stability and long service life;
Both concrete foundation and steel pipe pile foundation are suitable.
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Conventional columns, diagonal beams, and purlins are made of C-shaped steel, and diagonal supports are made of C-shaped steel or angle steel, etc
Ø 150/200 cast-in-place piles and strip foundations
Advantages: The double column structure has good stability, is suitable for flat terrain, has fast construction speed, and is easy and fast to install.
Ø Disadvantage: There are many pile foundations
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Conventional columns, diagonal beams, and purlins are made of C-shaped steel, and diagonal supports are made of C-shaped steel or angle steel, etc
Ø 150/200 cast-in-place piles and strip foundations
Advantages: The double column structure has good stability, is suitable for flat terrain, has fast construction speed, and is easy and fast to install.
Ø Disadvantage: There are many pile foundations
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Ø Conventional columns are used φ 83/ φ 89/ φ 108 round pipes, diagonal beams, and purlins are made of C-shaped steel, and diagonal supports are made of C-shaped steel or angle steel, etc
Ø 250/300 cast-in-place piles
Advantages: The large pipe sleeve and small pipe scheme has a wide range of adjustment for mountainous terrain, strong adaptability to complex terrains, can adapt to various complex terrains, fast construction speed, and convenient and fast installation.
Ø Disadvantage: The pile type is too large
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Ø Conventional columns are used φ 83/ φ 89/ φ 108 round pipes, diagonal beams, and purlins are made of C-shaped steel, and diagonal supports are made of C-shaped steel or angle steel, etc
Ø 250/300 cast-in-place piles
Advantages: The large pipe sleeve and small pipe scheme has a wide range of adjustment for mountainous terrain, strong adaptability to complex terrains, can adapt to various complex terrains, fast construction speed, and convenient and fast installation.
Ø Disadvantage: The pile type is too large
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Ø Conventional columns are used φ 60/ φ 76 round pipes, diagonal beams, and purlins are made of C-shaped steel, and diagonal supports are made of angle steel, etc
Ø 150/200 cast-in-place pile
Advantages: The large pipe sleeve and small pipe scheme has good structural stability, wide adjustment range for mountainous terrain, strong adaptability to complex terrains, and can adapt to various complex terrains. The pile foundation is small, the construction speed is fast, and the installation is convenient and fast.
Disadvantage: A large number of pile foundations
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Ø Conventional columns are used φ 60/ φ 76 round pipes, diagonal beams, and purlins are made of C-shaped steel, and diagonal supports are made of angle steel, etc
Ø 150/200 cast-in-place pile
Advantages: The large pipe sleeve and small pipe scheme has good structural stability, wide adjustment range for mountainous terrain, strong adaptability to complex terrains, and can adapt to various complex terrains. The pile foundation is small, the construction speed is fast, and the installation is convenient and fast.
Disadvantage: A large number of pile foundations
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Conventional columns and diagonal supports are made of C-shaped steel or angle steel, while diagonal beams and purlins are made of C-shaped steel, etc
Ø 300 prefabricated pipe piles
Advantages: The prefabricated cement pipe pile scheme has a large span, good structural stability, strong terrain adaptability, and strong adaptability to agricultural/fishing terrain. It adopts a double hoop structure and does not require on-site welding.
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Conventional columns and diagonal supports are made of C-shaped steel or angle steel, while diagonal beams and purlins are made of C-shaped steel, etc
Ø 300 prefabricated pipe piles
Advantages: The prefabricated cement pipe pile scheme has a large span, good structural stability, strong terrain adaptability, and strong adaptability to agricultural/fishing terrain. It adopts a double hoop structure and does not require on-site welding.
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Ø Conventional columns use channel steel, diagonal braces use C-shaped steel or angle steel, diagonal beams and purlins use C-shaped steel, etc
Ø 300 prefabricated pipe piles
Advantages: The prefabricated cement pipe pile scheme has a large span, good structural stability, and strong terrain adaptability. It is suitable for power stations with poor geological conditions in agricultural/fishing areas, and has a significant advantage in foundation height.
Ø Disadvantage: Electricity needs to be supplied on site for welding pillars with welding machines
Ø Compatible with vertical (two row vertical) and horizontal (four row horizontal) structures
Ø Conventional columns use channel steel, diagonal braces use C-shaped steel or angle steel, diagonal beams and purlins use C-shaped steel, etc
Ø 300 prefabricated pipe piles
Advantages: The prefabricated cement pipe pile scheme has a large span, good structural stability, and strong terrain adaptability. It is suitable for power stations with poor geological conditions in agricultural/fishing areas, and has a significant advantage in foundation height.
Ø Disadvantage: Electricity needs to be supplied on site for welding pillars with welding machines