Project location: Quzhou, Zhejiang
Grid connection time: 2023
Project capacity: 421.83KW
Adopting a single-layer cable with a span of about 19 meters and a single cable length of 57 meters.
Project location: Quzhou, Zhejiang
Grid connection time: 2023
Project capacity: 421.83KW
Adopting a single-layer cable with a span of about 19 meters and a single cable length of 57 meters.